Documents LIFE Fluvial

ACTIONS

A1 – Hydrogeomorphological study reports

Hydrogeomorphological study report of Eo river basin enclaves

Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes a description of the Eo river basin,
a geomorphological cartography and analysis of soil samples for each enclave of the conservation actions C1, C2 and C3.

download pdf
Hydrogeomorphological study report of Cecebre reservoir enclave
 
Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes a geomorphological cartography and
analysis of soil samples for each enclave of the conservation action C5.

Download pdf


Hydrogeomorphological study report of the Río Miño river basin enclave 
 

Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes geomorphological cartography and 
analysis of soil samples for each enclave of the conservation actions C6 and C7.

Download pdf
Hydrogeomorphological study report of the Estorãos river (Portugal) enclave 
 

Date: December 2018

Summary: 
This report is part of the preparatory action A1 and includes a geomorphological cartography and
analysis of soil samples for each enclave of the conservation action C8.

Download pdf

A1 – Monitoring indicators deliverable


Monitoring indicators of conservation actions report  

Date: March 2019

Summary:
This document establishes the monitoring indicators to be used in action D1,
as well as the methodology for its application.

Download pdf

A1 – Protocol for the elimination of invasive and alien species


Protocol for the elimination of invasive and alien species  

Date: December 2018 and modified in Decembre 2019

Summary:
This report is part of the preparatory action A1. The characteristics, distribution and control methods and management of all
alien species found in the enclaves of the project have been idescribed.

Download pdf

A1 -Vegetation analysis deliverables


Vegetation analysis report for the conservation actions in the Eo river basin.

Date: December 2018

Summary: 
This report is part of the preparatory action A1 and includes
vegetation cover characterization, detailed cartography and floristic inventories
for each enclave of C1, C2 and C3 conservation actions.

Download pdf

Vegetation analysis report for the conservation actions in the Betanzos-Mandeo SAC. 

Date:December 2018

Summary: 
This report is part of the preparatory action A1 and includes 
vegetation cover characterization and detailed cartography of C4 action enclaves.

Download pdf
Vegetation analysis report for the conservation actions in the Encoro de Abegondo-Cecebre SAC.  

Datea: March 2019

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C5 action enclave.


download pdf


Vegetation analysis report for the conservation actions in the Parda-Ladra-Támoga SAC.  

Fecha: Diciembre 2018

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C6 and C7 actions enclaves.


Download pdf

Vegetation analysis report for the conservation actions in the Río Lima SIC.  

Fecha: Febrero 2020

Summary: 
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C8 action enclaves.

Download pdf

A1 – Report about habitat 91E0* in Portugal


Update about habitat 91E0* in the Natura 2000 in Portugal. 

Date: February 2019

Summary

This report is part of the preparatory action A1 and includes a characterization of habitat 91E0*
in Portugal.

Download pdf

A2 – Technical projects deliverables


Technical project for the improvement and restoration of natural habitats in the river estuary corridor   
 Ribadeo/ría del Eo (ZEC RÍO EO-GALICIA ES1120002, ZEPA RIBADEO ES0000085, ZEC/ZEPA RÍA DEL EO ES1200016). 

Date: Novembre 2018


Summary 
This document includes the technical planning of the conservation action C1.

download pdf


Development of the action proposals - C1 

Date: April 2019


Summary: 
This report complements the technical project and includes the specific details of the action
providing information and detailed maps of C1 actions.


download pdf

Technical project for the improvement and restoration of the river corridor in the middle basin of the Eo river
(ZEC RÍO EO-GALICIA ES1120002, ZEC RÍO EO-ASTURIAS ES1200023). 

Date: October 2018

Summary: 
This document includes the technical planning of the C2 conservation action.


Download pdf




Developement of the actions proposal - C2. 

Fecha: Abril 2019

Summary :
This report complements the technical project and includes the specific details of the action
providing information and detailed mapping of C2 action

Download pdf


Complementary project for the conservation actions in the Fondón
recreational area (Vilaboa - A Pontenova) - C2 

Date: November 2019

Summary:
Complementary project for the conservation actions in the Fondón
recreational area (Vilaboa - A Pontenova) - C2 -

Download pdf

Technical project for the improvement of the conservation status of the 
Arnao-Villadún lagoons (ZEC / ZEPA RÍA DEL EO ES1200016)

Date: December 2018

Summary:
This document includes the technical planning of the C3 conservation action.


Download pdf



Development of the action proposal - C3.

Date: April 2019

Summary:
This report complements the technical project and includes the specific details of the action contributing
information and detailed mapping of C3 actions.


Download pdf

Technical project for the improvement of the conservation status of the fluvioestuarine 
corridor of the Betanzos estuary. 

Date: May 2018

Summary:
This document includes the technical planning of the C4 conservation action.

Download  pdf
 

Technical project for the sustainable management of hygrophilic forests in the 
ZEC Encoro de Abegondo-Cecebre. 

Date: March 2019

Summary:
This document includes the technical planning of the conservation action C5.

Download pdf

Technical project for the improvement of river corridors in the Parga-Ladra-Támoga Zec. 

Date: May 2018

Summary: 
This document includes the technical planning of the C6 conservation action.

Download pdf

Technical project for the sustainable management of inland wetlands in the upper Miño river basin. 

Fecha: Mayo 2018

Summary: 
This document includes the technical planning of the C7 conservation action.

Download pdf

Technical project for the improvement habitat 91E0* in ZEC rio Lima (PTCON0020). 

Date: August 2020

Summary: 
This document include the thecnical planing of the C8 conservation action.

Download pdf

A2 – Contingency plan


Contingency plan.

Date: February 2019 

Summary:
This document includes the contingency plan of the LIFE Fluvial project. 

Download pdf

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies
preload imagepreload image